Can You Pour Concrete in Winter? What You Need to Know

Many construction projects can’t wait for warmer weather, so the question comes up time and again – can you handle concrete work in winter? The answer is yes, but successful winter concrete requires proper planning and protection. Here’s what you need to know to get it right.

 

Why Concrete in Cold Weather Needs Special Care

When ambient temperatures drop, fresh concrete faces a serious risk. If the water in the mix freezes before the concrete cures, it can freeze and expand, causing permanent damage. Young concrete is especially vulnerable during its first 48 hours, when it’s developing crucial strength.

Even when temperatures stay above the freezing point, concrete in winter sets much more slowly than in warm conditions. This affects strength development and means construction sites need to plan for longer protection periods.

 

Critical Temperature Requirements

The concrete temperature at delivery should never drop below 5°C. This is the minimum safe threshold for ready-mix concrete. Once your concrete pour begins, you must maintain this temperature for at least 48 hours to protect the concrete from frost damage.

During these first two days, concrete reaches enough strength (around 2 N/mm²) to resist freezing damage. After this point, cold weather will slow down strength development, but won’t leave the concrete permanently damaged.

Temperature Range What It Means Action Required
Above 5°C Normal conditions Standard protection
2°C to 5°C Cold but workable Use an insulating material
Below 2°C Very cold Use heated concrete
Below 0°C Freezing Full heated protection is needed

Essential Steps for Pouring Concrete in Winter

Never pour on frozen ground. When frozen ground thaws, it shifts and can crack your concrete. Check construction sites thoroughly and use heaters to thaw the surface if needed.

Protect fresh concrete immediately with frost blankets or insulating material. Timber formwork provides good natural insulation for walls and columns. For slabs and exposed surfaces, add polythene sheeting or heated enclosures in severe conditions.

Remove all ice and snow from your sub-base, formwork, and reinforcement before starting. Ice prevents proper bonding and affects the final quality of your concrete pour.

 

Concrete Pumping in Cold Weather

For larger construction projects, concrete pumping services in Cambridgeshire offer a faster way to place concrete, reducing exposure time to cold weather. Boom pumps can deliver ready mix concrete quickly and precisely, which is especially valuable in winter when time matters.

Working with experienced concrete pumping services means your concrete arrives at the right temperature and gets placed before it cools down too much.

 

How Long to Protect Winter Concrete

In normal conditions, concrete needs about 48 hours of protection. For concrete in cold weather, extend this to three days or more. The lower the ambient temperatures, the longer you’ll need to wait.

Don’t rush formwork removal on construction sites in winter. Slower strength development means structural elements need extra time to safely support their own weight.

 

When to Delay Your Project

Sometimes waiting for better weather is the smart choice. Consider postponing when temperatures fall below 2°C and continue dropping, when severe frost is forecast, or when you can’t provide adequate protection for 48 hours.

At construction sites where the ground stays frozen or heavy snow is expected, delaying your concrete work in winter prevents wasted money and failed pours.

 

Working with Professional Concrete Suppliers

Experienced suppliers understand winter concrete challenges. They can provide heated ready-mix concrete, adjust water in the mix ratios for cold conditions, and offer concrete mixers that deliver at guaranteed temperatures.

Cardinalis Concrete uses volumetric concrete mixers that allow on-site mix adjustments. This means you get exactly the right specification for current conditions at construction sites across Cambridgeshire, Suffolk, Hertfordshire, Essex, and Norfolk.

For projects needing concrete pumping, professional services ensure rapid placement that minimises cold exposure. For technical guidance on cold-weather working, the LABC provides detailed advice for construction sites.

 

Getting It Right

Concrete in winter is entirely possible with the right approach. Keep concrete temperature above 5°C for 48 hours, use proper insulating material, never pour on frozen ground, and work with suppliers who understand cold-weather requirements.

With careful planning and protection, winter concrete can deliver the same quality results as summer pours. The key is respecting the conditions and taking the time to protect your investment properly.